Analisis Nilai Keekonomian Ketersediaan Kebutuhan Alat Penunjang Tambang untuk Operasional Pengupasan Overburden Dalam Meningkatkan Produktivitas Shovel PC3000E-6

Authors

  • Maya Matofani Politeknik Akamigas Palembang
  • Edwin Harsiga Politeknik Akamigas Palembang
  • Ayu Srimarta 1Politeknik Akamigas Palembang, Indonesia

DOI:

https://doi.org/10.55983/inov.v2i1.354

Keywords:

Shovel PC3000E-6, , APT , Productivity , Rental Cost

Abstract

Pit 3East ElectrificationBanko Barat PT Bukit Asam, tbk has provided mining support equipment of 2 units of Komatsu D375A bulldozer, 4 units of Komatsu D85SS bulldozer, 1 unit of MG825 grader and 1 unit compactor, with rental status. However, the availability of supporting equipment that has been provided can not fully support the April 2018 production target Therefore it is necessary to recalculate the amount of supporting equipment that should be provided in April 2018. After the improvement efforts in the form of additional supporting equipment, the total production capable of producing PC3000E-6 shovel amounted to 729,932 bcm / month, an increase of production amounted to 329,535 bcm / month.The result of calculation of requirement of mine supporting tool based on productivity of each tool can be concluded that the number of tools that should be provided are 2 units of Komatsu D375A bulldozer, 5 bulldozer D85SS units, 3 MG825A grader units and 2 compactor units. Based on calculations made the company issued a rental fee lower than the actual APT rental fee of Rp7.769 / bcm which is Rp 5,919 / bcm, making it more profitable than the previous conditions.

References

Abesyapradhi dengan Metode Npv dan IRR. Universitas Negeri Padang : Tugas Akhir diterbitkan”.

Ananda, E. V. (2015). “Analisis Biaya Differensial Untuk Pengambilan Keputusan Dalam Rencana Pengadaan Alat Berat Membeli Atau Menyewa Pada Cv Putri Dita Di Tenggarong”. Ejurnal Administrasi Bisnis. 3 (5) : 531-545.

Anonim. (2009). Sfecification and Application Handbook 30th Edition. Japan: Komatsu Ltd Tokyo.

Giatman, M. (2005). Ekonomi Teknik. Jakarta : PT Raja Grafindo Persada.

Indonesianto,Yanto. (2013). Pemindahan Tanah Mekanis. Yogyakarta : UPN “Veteran”Yogyakarta.

Kholil,Ahmad. (2012). Alat Berat. Jakarta : Universitas Negeri Jakarta.

Ludiantoro, F.F (2017) Analisis Kebutuhan Alat Berat Untuk Mencapai Target Produksi Pada Pelaksanaan Pekerjaan Overburden Tambang Batubara Di Kutai Kertanegara Kalimantan Timur. Masters Thesis, Itn Malang.

Novanti, Suci (2017) Analisis Keekonomian Jasa Rental Alat Berat Pada Penambangan Batubara Di Pit Mt-4 Selatan Tambang Air Laya, Pt. Bukit Asam (Persero), Tbk. Tanjung Enim Sumatera Selatan. Other Thesis, Upn "Veteran" Yogyakarta.

Pohan,A.F.,Nata,R.A.Floren,R.(2017). Efisiensi Alat Muat dan Alat Angkut untuk Pengupasan Overburden pada site A di PT Samantaka Batubara Desa PAuh RAnap Kecamatan Peranap Kabupaten Indragiri Hulu Provinsi Riau. Sains Dan Teknologi Industri, Vol 17,No.1

Prodjosumarto,Partanto. (1993). Pemindahan Tanah Mekanis. Bandung : Institut Teknologi Bandung.

Rudiansyah, W. O. (2014). “Perencanaan Penggunaan Alat Berat dan Biaya”. Jurbal Tekinik Sipil Untas Surabaya. 7 (2), hal.115-128.

Saldy, Tri Gamela (2012) Studi Keekonomian Jasa Rental Alat Berat Pada Kegiatan Pemindahan Overburden Pit Muara Tiga Besar Selatan Pt. Bukit Asam (Persero), Tbk Sumatera Selatan Periode 2012-2016. Other Thesis, Upn "Veteran" Yogyakarta.

Tenriajeng, Andi Tenrisukki, (2003). Pemindahan Tanah Mekanis. Jakarta : Guna Darma

Tresani, Nurahma. (2013). Ekonomi Teknik.Jakarta.

Zakri, R.S. (2014). Analisis Investasi Pengadaan Alat Berat Di Pt. Karbindo

Downloads

Published

2022-01-17

How to Cite

Matofani, M., Harsiga, E., & Srimarta, A. (2022). Analisis Nilai Keekonomian Ketersediaan Kebutuhan Alat Penunjang Tambang untuk Operasional Pengupasan Overburden Dalam Meningkatkan Produktivitas Shovel PC3000E-6 . Inovatif: Jurnal Ekonomi, Manajemen, Akuntansi, Bisnis Digital Dan Kewirausahaan, 2(1), 1–9. https://doi.org/10.55983/inov.v2i1.354