Assessment of Monitoring and Evaluation of Capital Projects in Hadiya Zone, South Ethiopia

Authors

  • Mekoro Arega Gashe College Of Business And Economics , University Wachemo University Ethiopia, Ethiopia

Keywords:

Binary logistic regression, Capital Project, Monitoring and Evaluation, Hadiya Zone

Abstract

This study was conducted to assess the factors affecting monitoring and evaluation of capital projects in selected woredas of Hadiya Zone, south Ethiopia. The main sources of data were both primary and secondary sources of data. Primary data were collected through questionnaires administered to the selected respondents and interview. The sampling technique employed for this research was purposive sampling to select sample Woredas. The binary logistic regression analysis was used by applying stata 14 software. Results of the study revealed that there is a positive and significant relationship between effective monitoring and evaluation of governmental capital project and availability of budget. Regression analysis revealed that a unit change in availability of budget increased evaluation of capital projects in government organization 1.409 units.  Correlation analysis showed that there was a positive and significant relationship between stakeholder participations and evaluation of capital projects in government organization. Regression analysis revealed that a unit change in stakeholder participations increases effectiveness of evaluation of capital projects by 1.192 units.  The study revealed that there was a positive and significant relationship between selection tools and techniques or methods and evaluation of capital projects. Regression analysis showed that a unit change in selection tools and techniques/methods increased monitoring and evaluation of capital projects by 2.721 units. Regression analysis showed that a unit change in skill level of experts increased effectiveness of monitoring and evaluation of capital projects by 2.688 units. The skill level of experts significantly affects the capital projects performance of monitoring and evaluation system. The planning, monitoring and evaluation core work process of governmental organization’s capital projects in each sector should employ experienced and skilled human power so that they can put in place effective monitoring and evaluation system. 

References

Acevedo, G. L., Krause, P., & Mackay, K. (Eds), (2012).Building better policies: the nuts and bolts of monitoring and evaluation systems, Washington DC, World Bank.

ADB. 2007.Project Performance and Process Evaluation. Special Evaluation Study. Available on 14/2/2013 http://www.abd.org/sites/default/

AFDB .2011. Evaluation of policy Based operation in the African Development Bank1999-2009: Evaluation Report. CSEA.

Annecke, W.( 2008). Monitoring and evaluation of energy for development: The good, the bad and the question able in M&E practice, Energy Policy,36, (8), pp. 2829-2835.

AsmamawTadege,Klakegg,O.J.,&Haavaldsen,T.2012.GovernanceofPublic Investment Project in Ethiopia.Project management Journal,43 (4)

Berry ,A.D. and T.Duhig.( 1987) Integrated Project control :State of the Art Report. Pergamoninfotechlimited ,England.

Brery, and, B. (2010, September). Defining the Type of M&E System: Clients, Intended Uses and Actual Utilization Promotes, USA.

Briceno, B. &Gaarder, M.(2010) .‘Institutionalizing Evaluation: Review of International Experience Research Paper. London.

CARE (2012, March).A Guide to Monitoring and Evaluation for result based: Care program South Sudan, Juba.

Crawford, P.,& Bryce, P. (2003). Project monitoring and evaluation: A method of enhancing the efficiency and effectiveness of aid project implementation. International Journal ofproject management, 21(5):363-373

Davidson, J. E. (2004). Evaluation Methodology Basics: The nuts and bolts of sound evaluation. Sage Publications, California.

Edmunds, R. &Marchant, T. (2008). Official statistics and monitoring and evaluation systems in developing countries: friends or foes Partnership in Statistics for Development in the 21st Century. OECD’s Development Co-operation Directorate, the Paris, France. http://www.paris21.org/sites/default/files/3638.pdf

Ethiopian Management Institute. (March, 2014)Project planning, Implementations, Monitoring Expenditure Templates. Addis Ababa.

FekaduSisay. (2011). The role of nongovernmental organizations in promoting the development of urban agriculture: the case of Addis Ababa City. Addis Ababa University: A thesis.

Gay, L. R., Mills, G. E., &Airasian, P. (2009).Educational research: Competencies for analysisand applications. Columbus, OH: Merrill.Journal of Adult Education,Volume 40, Number 1, 2011.

Guijt, I., Randwijk and Woodhill, J. (2002).A Guide for project M&E: Managing for Impact in Rural Development. International Fund for Agriculture Development (IFAD), Office of Evaluation and Studies (OE)

Gujarati.(2004),basic econometrics 4th edition, the McGraw-hill companies.

IFRC.(2011). IFRC Handbook for Project/Programme for Monitoring and Evaluation (M & E). In I. S. Planning and Evaluation (PED) Department, Project/Programme for Monitoring and Evaluation (M & E) Guildines. Geneva: International Federation of Red Cross and Red Crescent Societies (IFRC).

Jones, N. w. and Villar, E. (2008). ‘Situating children in international development policy: challenges involved in successful evidence-informed policy influencing’ in Evidence and Policy, vol4, no.1: p53-73.

Kelly, K .&Magongo, B. (2004).Report on Assessment of Monitoring and Evaluation Capacity of HIV/AIDS organization in Swaziland. Swaziland: NERCHA

Kusters, C, Vugt, S. V., Wigboldus, S. and Woodhill, B. W. (2011). Making Evaluations Mat A Practical Guide for Evaluators, Wageningen, Netherlands: Centre for Development Innovation World Bank, contemporary research Journal, 3(3), 13.

Luka.h& Muhammad, N. A. B. (2014).Project performance monitoring methods used in Malaysia and perspectives of introducing EVA as a standard approach. Journal of Civil Engineering and Management, 17(3), 445-455

Mackay, K. (2007). How to Build M&E Systems to Support Better Government. Independent Evaluation Group. The World Bank. Washington, DC.

Magondu, A. (2013). Factors Influencing Implementation Of Monitoring And Evaluation In Hiv Research Projects, A Case Of Kenya Aids Vaccine Initiative (Kavi) (Masters dissertation

Mantel, Jr., Jack, Samuel, J., M., Margaret M.(2008). Core Concepts of Project Management. River Street, Hoboken-USA: John wiley&sons.inc.

Management Agency(MA). (2014). Ethiopian Protection of basic services social accountability program,and implementation manual. Addis Ababa

Marangu, E. M. (2012). Factors influencing implementation ofcommunity based projects undertaken by the banking industryin Kenya. a case of Barclays Bank of Kenya .

Maurer, T. J., & Pierce, H. R. (1998). A comparison of Likert scale and traditional measures of selfefficacy.Journal of Applied Psychology, 83(2),324-329.

McCoy, L. Ngari, P. &Krumpe E. (2005).Building Monitoring, Evaluation and Reporting Systems for HIV/AIDS Programmes.Washington, D.C. Business and management Journal, 8(21).

Merna, T., & Al-Thani, F. (2008). Corporate Risk Management (2nd ed.). England: John Wiley & Sons, Ltd

MOFED. (2012). Assessing Progress towards the MilliniumDevelopmen Goals: Ethiopia MDGs

MorraImas, L.G. &Rist, R.C. (2009). The Road to Results: Designing and Conducting Effective Development Evaluations. Library of Congress Cataloging-in-Publication Data: Washington.contemporary research Journal, 3(3), 13.

Murunga, K. B. (2011). Factors influencing the application of participatory monitoring and evaluation approach of managing development projects in Kenya. The case of local links projects.(Unpublished master‟s thesis). University of Nairobi.

Nabris, K. (2002). Monitoring and Evaluation, Palestinian Academic Society for the Study of International Affairs . New York: John Wiley & Sons, Inc

Ofori, G. (2000) Challenges of Construction Industries in Developing Countries: Lessons from Various Countries. Conference Papers, 2nd International Conference on Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, 15-17 November 2000, Gabarone, 1-13.

Patton, M. Q., (2008) Developmental Evaluation: Applying Complexity Concepts to Enhance Innovation and Use.New York: Guilford Press.

Paul,M.(2005).Principles of project monitoring and evaluation www.plantsscience. Paulinepublications Africa daughters of St Paul 00100 Nairobi G.P.O Kenya. Contemporary Research Journal, 3(3) march 2013.

SAMDI,(2007).Capacity-building for Monitoring and Evaluation in the South AfricanGovernment: A Curriculum Framework. Pretoria: Government Printer.

Tilahun, G.(2013). Exploringthe Practiceof Monitoring and Evaluation System of Capital Projects,thesis Degree of Master of Art in Public Financial Management, AdisAbeba ,Ethiopia.

UN Global Pulse,(2016). ‘Integrating Big Data into the Monitoring and Evaluation of Development Programmers.

William, G.,Zikmund., Barry J.,Babin., Jon C., Carr and Mitch Griffin, (2010) Research Business Methods, 8 ed. Canada.

World Bank, (2011). Monitoring & Evaluation: some tools, methods and approaches. The World Bank, Washington, D.C. Business and social scienceJournal,5(1)

Downloads

Published

2022-01-02

How to Cite

Gashe, M. A. (2022). Assessment of Monitoring and Evaluation of Capital Projects in Hadiya Zone, South Ethiopia . International Journal of Economics, Social Science, Entrepreneurship and Technology (IJESET), 1(1), 1–12. Retrieved from http://journal.sinergicendikia.com/index.php/ijeset/article/view/22